LAX Terminal 1.5

The project proposes the construction of a new building located between Terminals 1 and 2. The new facility will ease congestion and provide connectivity between the two terminals – both within the ticketing and check in portion as well as post-security screening. LAX Terminal 1.5’s post-security airside pedestrian connection means passengers connecting between the two terminals will no longer have to leave the secure area of the concourse, exit the building, and go through security again to make a connection. LAX Terminal 1.5 plays an integral role in LAWA’s efforts to modernize the north terminals.

 

LAX Terminal 1.5 Under Overview


 Elements of the Project 

  • Additional space for passenger ticketing and baggage check-in
  • Additional security screening
  • Additional baggage claiming functionality in support of existing operations within the north terminals
  • A secure passenger connection
  • Office and support space

 

 

Elements of the Project


Project Objectives
The LAX Terminal 1.5 project will:

  • Enhance passenger level of service and satisfaction in the north terminals
  • Provide additional space for federal security requirements
  • Provide a secure connector between Terminal 1 and Terminal 2 to allow passengers to flow between terminals with no requirement for passengers to repeat the security screening process
  • Provide an uninterrupted link between the ticketing and baggage claim lobbies of both Terminals 1 and 2, improving the passenger experience and providing operational flexibility and efficiency for the airport and airlines

BOAC Hearing
BarTail


At the time and place set forth below, the BOAC will hold a Public Hearing at which it will consider Executive Director’s LAX Plan Compliance Report for the Proposed Project, adoption of the Initial Study/Mitigated Negative Declaration and Mitigation and Monitoring and Reporting Program, and Project Approval:

Valley Municipal Building
2nd Floor City Chambers
14410 Sylvan Street, Van Nuys, California 91401
Thursday, December 1, 2016 at 10:30 AM

Comments may be presented orally or in writing at the public hearing. A hard copy can be viewed at the following location during normal business hours:

  • LAWA Administrative Offices, One World Way, Room 218, Los Angeles, CA 90045


The agenda for the public hearing will be posted 72-hours prior to the public hearing date and can be accessed online at http://www.lawa.org/boac_granicus.aspx The Public hearing and parking facilities are wheelchair-accessible. Sign Language interpreters, assistive listening devices, and other auxiliary aids and/or services may be provided, if requested a minimum of 72-hours prior to the public hearing, by calling the LAX Stakeholder Liaison Office at (800) 919-3766.


Submitting Comments online click here

 

LAX Plan Compliance Review Process:
BarTail_green

Prior to issuing any grading, building or use of land permit on the a proposed Project, the Los Angeles City Council must grant an LAX Plan Compliance approval pursuant to the LAX Specific Plan. This approval will be based on recommendations from LAWA’s Executive Director and the Board of Airport Commissioners. The Executive Director’s recommendation will be included in the Executive Director’s Report.


Environmental Documents
BarTail
California Environmental Quality Act (CEQA)


 

 

 

About Us Current Projects Land Use & Entitlements Studies & Reports
Airport Basics
Airport Development Group
Stakeholder Liaison Office
Settlement Agreements
Community Benefits Agreement
For Tenants
Subscribe
Century Corridor Streetscape Plan
LAX Terminal 2 & 3 Modernization Project
LAX Terminal 1.5
LAX Landside Access Modernization Program
LAX Plan Compliance Process Tenant Approval Process
LAX Alcohol Permits (MCUP)
Plans and Ordinances
Sustainability Program
Mitigation Monitoring Reporting Program (MMRP)
Community Benefits Agreement Report
Traffic Generation Report
Aviation Activity Analysis



Stakeholder Liaison Office
One World Way, Room 219
Los Angeles, CA 90045
Phone (800) 919-3766
Fax (424) 646-9209
Email: stakeholderliaison@lawa.org


© Los Angeles World Airports. All rights reserved.