 |

Introduction/Overview
LAX Campus Vision (March 2013)
Quick Links
LAWA Standards for Construction Contracts
Guide Specifications03 00 00 Concrete 04 00 00 Masonry 05 00 00 Metals
06 00 00 Wood, Plastics, and Composites
07 00 00 Thermal and Moisture Protection
08 00 00 Openings
09 00 00 Finishes
10 00 00 Specialties
11 00 00 Equipment 12 00 00 Furnishings
13 00 00 Special Construction 14 00 00 Conveying Equipment
15 00 00 This Section Not Used by CSI 16 00 00 This Section Not Used by CSI 17 00 00 This Section Not Used by CSI 18 00 00 This Section Not Used by CSI 19 00 00 This Section Not Used by CSI 20 00 00 This Section Not Used by CSI 21 00 00 Fire Suppression
22 00 00 Plumbing
23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)
24 00 00 This Section Not Used by CSI 25 00 00 Integrated Automation
26 00 00 Electrical
27 00 00 Communications
28 00 00 Electronic Safety and Security
29 00 00 This Section Not Used by CSI 30 00 00 This Section Not Used by CSI 31 00 00 Earthwork 32 00 00 Exterior Improvements 33 00 00 Utilities 34 00 00 Transportation 35 00 00 Waterway and Marine Construction 36 00 00 This Section Not Used by CSI 37 00 00 This Section Not Used by CSI 38 00 00 This Section Not Used by CSI 39 00 00 This Section Not Used by CSI 40 00 00 Process Integration 41 00 00 Material Processing and Handling Equipment 42 00 00 Process Heating, Cooling, and Drying Equipment 43 00 00 Process Gas and Liquid Handling, Purification, and Storage Equipment 44 00 00 Pollution and Waste Control Equipment 45 00 00 Industry-Specific Manufacturing Equipment 46 00 00 Water and Wastewater Equipment 47 00 00 This Section Not Used by CSI 48 00 00 Electrical Power Generation
Airfield Standards
Concessions
Data Standards
Environmental / Land Use / CEQA IT Infrastructure Standards of Practice Mechanical Standards (Covering Sections 22, 23 and 25) Restrooms, Design Intent Structural Standards
|

Like and follow us on:
|
 |